
Add to Cart
This equipment, abbreviated as the one-machine for excavation, pole erection, stringing, backfilling, grinding, traction, and simply termed stringing machine, is widely used in various fields including power, telecommunications, municipal energy construction, afforestation, cement pole pit excavation, solar panel mounting in solar photovoltaic projects, screw piles, vertical drilling rods, trenching, stringing, backfilling, traction, and lifting of objects ranging from 3 to 8 on the ground. It is an ideal choice for both individual and unit construction, suitable for various terrains including sandy soil, clay soil, gravelly soil, burial soil, weathered rock soil, frozen soil, construction waste, backfill sand, and landfill.
Feature
1. Equipped with four hydraulic stabilizer legs, capable of both 2-wheel and 4-wheel drive, featuring wide tires.
2. Featuring a 360° rotating gear motor, hydraulic lifting, and drilling system, integrating the spiral drilling rig with a crane, allowing a single unit to perform both drilling and pole erection tasks, enhancing efficiency and cost-effectiveness.
3. Powered by a YTO tractor, providing ample strength and robust off-road capability. Fully hydraulic driven. Automatic stringing and pole erection.
Benefits of Pole Erection Machine
1. Significantly reduced costs and greatly accelerated work speed, relieving the burden of manpower management.
2. Completely eliminates common labor issues, ensuring projects are executed on time.
3. Possesses high production capacity, with rational planning and execution within an 8-hour shift.
4. Only requiring two workers to complete the installation of 25 to 30 poles per shift.
5. Pole installation work can be completed by just two workers, whereas the current manual method requires 12 to 14 workers.
6. Excavation takes minimal time compared to the 5 to 6 hours required for manual labor.
7. Cost savings for contractors.
Detailed Data
Drilling depth | 0 -6m |
Drilling diameter | 1m-2m |
Standard drill pipe | 300mmx3M,600mmx3M |
Lifting method | Full hydraulic |
Standard drilling time | 40s (diameter of 300mm-500mm) |
Drill Head Material | Tungsten alloy |
Auger Material | High-manganese carbon steel |
Crane | 3T/5T/8ton crane |
Tractor | Model 1004 BOMR tractor, 100HP, four wheel drive |
Dimension | L5900*W2000*H2600mm |
Weight | 7.3 t |
Application | loess, clay, pebble sand, weathered granite, tundra. |
Not suitable for | Rocks, whole sand bed ,household garbage and so on. |
Operator needed | 1 person |
To support transmission work, Marshine Power offers a range of OEM and specialized products including tubular stringing rollers, hydraulic pullers, wire rope pulley blocks, lifting snatch blocks, wire rope grips, cable drum winding shafts, and stands—all manufactured to ISO 9001:2008 standards and distributed to over 50 countries worldwide. For projects such as emergency tower repair and cross structures, customization is available, along with safety tools and accessories, with no minimum order requirement. We offer complimentary assistance with technical queries or product inquiries. Feel free to reach out to us. Thank you.
1. Training and Services:
Marshine is a company specializing in the development, design, and manufacturing of construction electrical equipment and tools. We not only produce and sell products that meet international standards, OEM, and custom products, but also provide quality tracking and service monitoring.
2. What about the quality of your products?
Our products are strictly manufactured according to domestic and international standards, and each product undergoes testing before leaving the factory. If you would like to view our quality certifications and various test reports, please consult us.
3. Why choose us?
Because we can provide you with high-quality service, quality products, and reasonable prices. In addition, we can also offer customers smooth delivery and excellent solutions.
4. Customer Inquiry:
If there is an emergency, customers can also use online chat (Skype, WeChat) for faster and better communication. Any inquiries will be replied to within 12 working hours.
5. How to obtain samples?
We can provide free samples for buyers to test, but buyers need to pay for shipping. Existing samples take 2-3 days. If there is no stock, we will notify the delivery date.
6. What about packaging and shipping?
All goods will be securely packaged in plywood boxes for long-distance transportation. We support EXW, FOB, CIF, CFR terms.
Required documents such as packing lists, commercial invoices, bills of lading, air waybills, CO, Form E, Form F, etc., will be provided.
Note: If you cannot find the products you need, please feel free to contact us. We will provide the most favorable quotation as soon as possible after confirming your requirements.